When the doors open in the morning, the floor must be ready.
Cure time sets the schedule
An after-hours job has a hard stop: the time the business opens. The installation method decides when people can walk on the new floor. Before you book the crew, compare the drying and cure times of each method.
| Method | Foot traffic | Notes |
|---|---|---|
| Pressure-sensitive adhesive | Often immediately after installation | Used with vinyl flooring and carpet tiles |
| Epoxy or urethane adhesive | Up to 48 hours to fully cure | Polyurethane adhesive installs rubber rolls and tiles |
| Epoxy floor coating | About 16 hours after each coat | A full cure takes about a month |
| Polyaspartic floor coating | An hour or less after the first coat | Cures within 30 minutes to an hour |
| Interlocking PVC tiles | Immediately after installation | No adhesive or special tools |
Floors that need no glue
The 6.5mm Diamond Flex Tiles use a hidden interlock that snaps together with no glue. They install over any flat, structurally sound surface, and you can use them immediately. Their product page lists retail, healthcare, school and government buildings as uses. Carpet tiles can go down with a pressure-sensitive adhesive. This adhesive is releasable, so you can lift and replace one tile later.
Accessories to bring
- Seam sealer: small beads of black polyurethane glue along a rubber roll seam, where a full-spread glue cannot go.
- Transitions: T-molding joins two floors of the same height. A reducer joins floors of different heights.
- Spacers: flooring spacers keep the correct expansion gap around a floating floor.
- Tools: an adjustable T-square for straight cuts, a utility knife, a trowel and a rubber mallet.
Install transitions with construction glue under a heavy object, or nail them to the subfloor.
Tell us the area and your opening time. We will help you choose a method and the accessories.
Plan the night shift
- Check that the subfloor is flat, clean and sound before the night of the job.
- Get the flooring and all accessories to the site before the crew arrives.
- Start with the area that has the longest cure time.
- Install trims and transitions last, as the finishing touch.
- Open the area only after the cure time in the product instructions.